About Time Solutions Ltd have just completed urgent works for a local landlord to protect the externals of his property. The project also required control over Health & Safety up to CDM 2015 regulations.

The landlord’s brief was to keep costs low but to ensure structural repairs met the design of the structural engineer.

The shop trader’s brief was to ensure the shop remained opened, dust-free and tidy during works.

Our aims were to ensure a swift project, on time, on budget and safe for all.

JOB DONE!

Project: USA Nails, Melksham, Wiltshire. Structural repairs and external painting.

Project Manager: Bob Turner, MD & SMSTS

Site Manager: Vicky Pringle, SMSTS

Project cost: Undisclosed. Achieved fixed cost.

Project task: Survey, Liaising with local council, Scaffolding, Canopy removal, HeliBar repairs, repointing, masonry painting, project management and H&S.

Project timeline: Expected 4 weeks, delivered in 3.